Most rooms that we install our equipment have incoming ventilation and/or air conditioning. The key in these circumstances is to get as many air exchanges per hour through our equipment as we can in order to combat the extra air flow. This forms part of the specification process that distributors should conduct with each customer prior to them placing their order, if there is significant air being brought into the space, we would need to increase our equipment capacity